A. The final plat and accompanying data shall be filed with the City Clerk/Treasurer within six months after the date of action of the preliminary plat; otherwise such preliminary actions shall be voided.
B. One approved-type of transparency of all sheets of the plat at a scale of 100 feet to one inch and three black-line prints of each, as well as one transparency of all sheets at a scale of 200 feet to one inch and three black-line prints of each, together with the required number of copies of accompanying data, shall be included in the filed material.
C. The City Clerk/Treasurer, the City Council and any other indicated City official(s) shall check, or cause to be checked, the filed material for conformity with the requirements of law and with these regulations, including conformity with any conditions of approval of the preliminary plat, and the Engineer shall check the plat and survey for required technical accuracy.
D. A traverse of the boundaries of the plat and all lots and blocks, when computed from field measurements, must close within a limit of error of one foot to 7,500 feet of perimeter.
E. If satisfactory, the City Clerk/Treasurer shall issue a receipt, acknowledging acceptance of the plat. If not satisfactory, the subdivider shall cause the required changes and additions to be made before acceptance for filing and issuance of receipt.
